Skip to content
HomeVideosBooksBlogs
AllTop postsTopics
Podcasts
HistoryListsWatch laterLiked videosFollowing

The videos, books, blogs and podcasts Hacker News keeps recommending, all in one place.

VideosBooksBlogsPodcastsAboutPrivacySettings

Data from Hacker News, HackerTube, HackerBooks, HackerBlogs and Open Library. Credits · Not affiliated with Y Combinator.

HomeVideosBooksBlogsPodcasts
Ctrl K
    C

    Caltrain HSR Blog

    caltrain-hsr.blogspot.com · Personal blog · on HN since 2012

    A blog on Caltrain and California high-speed rail, covering operations, electrification, costs, and infrastructure planning in the Bay Area.

    Visit blogRSSHN submissions
    Culture & SocietyEconomics
    What HN says

    HN commenters recommend it for Caltrain operations detail, such as dwell times and the new trains, and for upgrade ideas.

    Stats for nerds
    22HN people shared it
    11linked in comments
    53story points
    Aug 2024last shared
    2012people per year2024

    Top posts on HN

    1. 1
      Growing Caltrain into an 8-Lane Freeway (2018)
      1 person · 30 points · first shared 2019 · 51 comments on HN
    2. 2
      Caltrain Has a Dwell Time Problem
      1 person · 6 points · first shared 2016 · 1 comments on HN
    3. 3
      Electrification Delayed
      1 person · 4 points · first shared 2019 · Discussion on HN
    4. 4
      Merge Caltrain into Bart?
      1 person · 3 points · first shared 2020 · 1 comments on HN
    5. 5
      Easy Little Fixes
      2 people · 2 points · first shared 2025 · Discussion on HN
    6. 6
      The End of CBOSS
      2 people · 2 points · first shared 2018 · Discussion on HN
    7. 7
      CBOSS Dumpster Fire Update
      1 person · 2 points · first shared 2017 · Discussion on HN
    8. 8
      Build a Dumbarton Rail Tunnel
      1 person · 2 points · first shared 2019 · 1 comments on HN
    9. 9
      Down the Tubes with DTX
      2 people · 1 points · first shared 2021 · Discussion on HN
    10. 10
      Caltrain HSR Compatibility Blog: Freeway Lanes of Caltrain
      1 person · 1 points · first shared 2017 · Discussion on HN

    What HN people wrote when they linked it

    • sjsamsonOct 2020

      >I don't really think that was in the cards. The car was already prevalent before the interstate system was built, and the military was much more about a road solution than rail.

      These are policy decisions. Other countries chose to invest in rail. The US chose to invest in other forms of transportation and created adverse policy conditions in which rail largely withered and nearly died. I made another comment [1] where I talk about the political milieu that likely contributed to this.

      I would also call out the fact since WW2, the US has lost more than half its railroad route-miles (300,000+ to ~147,000 today). Other countries had to rebuild their infrastructure after the destruction of the war. No bombs were dropped on American railroads. Aside from figurative bombs of bad policy by political leaders, competitors in automotive/airlines, and the deeply ignorant idea that railroads and trains are an obsolete 19th century technology.

      >As to cost, look at California trying to add high speed rail, as they have failed badly for what was a very modest set of served areas.

      I am well aware of the California HSR project and its many failings. It has nothing to do with anything inherent to rail technology. I view it as symptomatic of and the inevitable result of a broken political system, poor project management, a Transportation/Construction-Industrial Complex (similar to the Military-Industrial Complex), monied special interests like construction and engineering contractors run…

    • bryanandersonApr 2024

      The Caltrain KISSes are not really off the shelf, in many ways, good and bad and ugly.

      The (arguably) good: 1) they have a boxier profile than the standard KISS, which some have complained about, but the reason the European version is less boxy is because Europe has a more restrictive loading gauge (the allowable cross-section of the vehicle), resulting in a more cramped upper level. Caltrain doesn’t have this issue, and so the upper level will not be cramped. 2) The Caltrain KISS is more powerful than the standard, which would allow for a faster top speed… if the corridor was upgraded to make use of it, which it is not. Maybe someday.

      The bad/silly: two sets of doors… a higher set since HSR might allegedly someday come to this corridor and require changing the platform height, and a lower set because that ain’t happening for a long time, if ever. I think there are some other bad/silly things which I’ve willfully forgotten about (I think they fucked up the ADA lifts somehow?), which I’m sure are documented somewhere on Clem Tillier’s excellent blog.[0]

      The ugly: “buy America” requirements forced Stadler to build an entire factory in the US, raising the cost by over 50% compared to the standard KISS. This is the bad kind of industrial policy which raises costs without actually building up US industrial capacity in this field (if Stadler closed the plant tomorrow, the US wouldn’t retain any expertise or capacity to build trains).

      [0] https://caltrain-hsr.blogspot.com

    • manquerJan 2024

      That is not true for Caltrain .

      Caltrain tracks and right of way was purchased in 1991 from Southern Pacific (now Union Pacific) by Peninsula Corridor Joint Powers Board which is basically Muni, SamTrans and VTA for most of the route.

      Here is a detailed map of who owns what https://caltrain-hsr.blogspot.com/2009/01/caltrain-right-of-way-maps.html

      While it is true that Southern Pacific owned the line for most its history it was always built as commuter line. Union Pacific is only allowed to operate 3 freight lines per day on weekdays now.

      Freight does not take priority, historically freight did not fund the development of the line, Characterizing it a freight line with passengers added on to it is not a fair representation.

      --

      I cannot speak for Amtrack, I don't know the network personally and it is also big and very composite a network to make any general statements like for Caltrain. However in general commuter heavy lines were built as commuter lines very early one because there was economic case to do so. It is the only the long distance lines which do not have the economic viability on their own that can only run on freight lines.

    • inferiorhumanJan 2020

      Mostly they don't want to mingle with the hoi polloi.

      Atherton (not Belmont – all those shitty little peninsula towns blend together in my mind) sued because they didn't want trees removed to make way for overhead wires (the claim was that "cleaner" diesel would be better than electric)[0]. Then they sued because the poles were going to be 10 ft higher than promised[1]. Another Atherton resident[2] sued because he wanted Union Pacific to explicitly approve everything beforehand. More dreck[3].

      Caltrain's getting sued left and right over the electrification, starved for money by BART, and generally ignored by politicians. If you're ever curious about why Bay Area transit is as bad as it is, Caltrain is a great case study.

      0: https://en.wikipedia.org/wiki/Electrification_of_Caltrain#Lawsuits

      1: https://www.almanacnews.com/news/2017/12/21/atherton-battling-caltrain-over-electrification-poles

      2: http://www.cahsrblog.com/2009/08/another-peninsula-nimby-lawsuit/

      3: https://caltrain-hsr.blogspot.com/2009/08/atherton-et-al-lawsuit-decided.html

    • m0lluskJul 2021

      No, I'm talking about the current round of work in the Central Valley that just started. Currently all the big HSR works are going on there. I can't currently find the report with the oddly high grade separation count and it is possible that my read of that was mistaken, but I am pretty sure that if you look at the recent documents they just moved on from CP1 and started on either CP2 or CP4 in the south end of the Central Valley and it includes a very large number of grade separations. That report was posted somewhere on either https://hsr.ca.gov/ or https://www.buildhsr.com a month or two ago.

      Fortunately these Central Valley grade separations are merely expensive while the CalTrain corridor work on the peninsula is experiencing explosive growth of costs from the the complexity of grade separations because of the very tricky maze of rights of way especially in and around Redwood City: https://caltrain-hsr.blogspot.com/2021/05/the-exploding-cost-of-grade-separations.html

    • mcpherrinmSep 2014

      It's an issue of "loading gauge".

      If caltrain adopted higher platforms, they would interfere with the size of freight trains passing through.

      There are ways around this: If all the high platforms were on 4-tracked sections, the freight could use the express tracks only. Mixing high and low boarding might be more painful though.

      Not to mention the current train stock doesn't support level boarding, so Caltrain would be restricted to use them as express trains and only have high platforms at local stations, for example.

      Or the platforms could be far away from the trains and they use extending platforms: That is potentially unreliable and costly.

      There is a somewhat reasonable blog about this type of issues at http://caltrain-hsr.blogspot.com/ which is mostly reasonable though it tends to be written as if it is the only reasonable choice.

    Related

    Pedestrian Observationspedestrianobservations.com160 people

    Why American Construction Costs Are So High

    Pedestrian Observations
    Personal · last shared 2026
    Uber Blogblog.uber.com228 people

    Announcing UberPool

    Uber Blog
    Company · last shared 2015
    Uber Engineering Blogeng.uber.com525 people

    Why Uber Engineering Switched from Postgres to MySQL

    Uber Engineering Blog
    Company · last shared 2025
    Seattle Transit Blogseattletransitblog.com27 people

    Seattle's next light rail plan is slow because it reflects our values

    Seattle Transit Blog
    Publication · last shared 2026
    Energy Institute Blogenergyathaas.wordpress.com17 people

    California's Exploding Rooftop Solar Cost Shif

    Energy Institute Blog
    Publication · last shared 2026
    Rachel Krollrachelbythebay.com493 people

    fork() can fail

    Rachel Kroll
    Personal · last shared 2026
    Yale Climate Connectionsyaleclimateconnections.org94 people

    The North Atlantic ocean current may be slowing

    Yale Climate Connections
    Publication · last shared 2026
    Second Avenue Sagassecondavenuesagas.com22 people

    An observation on MetroCards, after a $1 fee (2013)

    Second Avenue Sagas
    Publication · last shared 2026